The bond proposal focuses on enhancing safety across all campuses, modernizing facilities to align with current educational standards, and expanding hands-on learning opportunities for students.

What’s Included?

PROP A

Proposition A includes the design, construction, renovation, and upgrading of school facilities, enhancements to safety and security, and the replacement of aging fleet vehicles.

PROP B

Proposition B focuses on career and technical education (skilled trades), the Naval Junior Reserve Officer Training Corps (NJROTC), fine arts additions, and physical education indoor and outdoor spaces used for required curriculum and active learning.

PROP C

Proposition C includes the design, construction, renovation, improvement, and modernization of the existing Hornet Stadium and related infrastructure.

Proposition A

General Facilities, Safety & Security, Modernization

    • Roofing & HVAC updates

    • Interior Modernization

    • Comprehensive plumbing, electrical, & lighting upgrades

    • Resurfacing Parking Lots

    • Campus Renovations​

    • Junior High Locker Room Renovations ​

    • SPED Classroom and Office Renovations​

    • New District Wide Utility Plant (HVAC)

      • North of existing location

    • New Equipment:

      • Chillers, pumps, & associated mechanical room piping

    • Connect new equipment to existing plant piping network

    • Removal of existing plant

  • Early Childhood Center  – PreK, K, & 1st Grade

    • Additional Classrooms

    • Expand Library

    • Expand Cafeteria

    • Intercom systems

    • Access controls at all campuses

    • District-Wide: Exterior lighting

    • District-Wide: Replace doors

    • ECC - Extend vestibule

    • District-Wide Upgrade: Wireless & Wired Infrastructure

    • District-Wide: New Phone System & Intercom Infrastructure

    • Battery Backups for Networks and Intercoms

    • Pk-6th: Interactive Instructional Displays

  • Replace Aging Buses

    • The average age of bus fleet is 18 years old

    • Air Conditioned Buses

    • Increase High School Cafeteria Capacity

    • Additional covered outdoor seating

    • Enclosed outside courtyard

    • Multipurpose Use

    • Upgrade and enhance playgrounds and outdoor areas across campuses, incorporating bike paths and softer, more durable surfaces for improved safety and usability.

    • PK-6 grade PE Facilities.

    • Construct covered walkways leading to play areas.

    • Additional queuing at Primary

    • Additional parking lot ECC

    • Additional queuing at ECC

    • Renovate Auditorium

    • Replace Seating

    • General lighting and rigging 

    • Audio Visual equipment

Proposition B

Academics and Career and Technical Education (CTE) Spaces​

  • Career & Technical Education (CTE)

    • Newly construct CTE Facility

    • Renovate CTE classrooms & labs

    • Follow recommended space allocations to ensure adequate square footage for large machinery, tools, and workstations
      Ensure ADA (Americans with Disabilities Act) compliance in (CTE) classroom

    • Covered Outdoor Classroom Area

    • Environmental Data Collection Pier

    • Wildlife Observation & Research Blinds

    • Educational Equipment Storage

    • Interactive Learning Trails with Informational Displays

    • Ecosystem Study Area Connecting Saltwater and Freshwater ponds

    • Restrooms

  • NJROTC

    • Expand and renovate classroom space

    • Remodel locker rooms & restrooms

    • Expand Storage space

    • Renovate and Enhance NJROTC Annex

  • Fine Arts

    • New Band Space

    • New Dance Classroom

    • Renovation for Theatre Arts Classroom

    • Enhance Classroom Space for Choir

    • Secondary Gym for 5A High School

    • Physical Education Classes

    • Cheerleading Locker Room

    • Girls Soccer Locker Room

    • Turf the baseball field

    • Turf the softball field

    • Turf practice soccer field

Proposition C

Hornet Stadium Renovations and Safety Improvements ​

    • Stadium switch Home Side to Visitor Side

    • Additional seating to Home side

    • Expand ADA compliant seating accessibility

    • New Press Box on Home Side

Providing opportunities for innovative learning, exploration, and growth in Flour Bluff ISD.